Plan the first working session
Interview the supplier quality engineer and supplier contact
Show a part submission returned despite having every attachment. Which drawing revision, measurement result or approval applied to a different part version?
What the team takes away
A submission checklist links each required artifact to part and revision, with discrepancies kept open for the quality engineer before technical acceptance.
What enters the register
Use the purchase part revision, approved submission checklist, supplier package manifest and existing quality approvals. Match every document to the correct supplier site and component drawing.
Review sequence
- Identify mandatory items for the requested submission level.
- Compare revision, site and component identifiers across the package.
- Draft a missing-item list and separate administrative gaps from technical decisions.
A misleading match
A supplier provides all required filenames from a previous tooling revision. A filename-only checklist would mark the package complete despite a material change to the part.
Bring the queue into use
Pilot with completed submissions across two suppliers, including a corrective resubmission and a site transfer. Confirm that superseded documents stay visible as historical evidence.
Measure the exceptions
Measure first-review returns caused by missing or stale documents and time to locate the controlling drawing. Track engineering rejections separately from administrative completeness.