Replenishment planner
Stock available
Source record
- Lead-time demand: 44
- available: 20
- pack size: 12
Decision
Propose two packs
Inspect the reasoning
Twenty-four units cover the forecast gap of 24. The planner checks supplier commitments and approves the order.
Shelf was empty
Source record
- Recorded sales: zero
- shelf count: zero
- promotion active
Decision
Request a demand adjustment
Inspect the reasoning
Sales are censored by the stockout. Compare promoted weeks with available inventory before setting an order quantity.
Does the forecast improve the decision after constraints are applied?
- Bring to discovery
- Bring historical demand, stockout signals, lead times, pack sizes and the planner’s actual orders at each cutoff.
- Evidence to proceed
- Approve a planning trial when held-out performance improves against a credible baseline and planners understand where constraints override a purely statistical suggestion.
What the engagement delivers
A benchmark forecast, uncertainty ranges, feasible planning options and a replay showing how each option would have performed against the current planning rule.
Implementation decisions
Seasonal baseline or constrained forecast?
Seasonal baseline
A seasonal or moving-average rule is cheap to explain and makes a useful baseline on stable items.
constrained forecast
A richer forecast and constrained optimizer can address promotions and capacity, with more data and recalibration work.
Maintain separate scores for predictive accuracy and decision quality. An order meeting a supplier minimum can be rational even when it exceeds the forecast. Run rolling historical forecasts and compare service levels alongside carrying costs and the effort introduced by exceptions.
Where to start in your organization
A small team
Start with one category, one supplier lead time and known order multiples. Backtest against the rule currently used.
Across an enterprise
Segment demand by speed and uncertainty. Model shared capacity, transfer constraints and the cost of decisions that shift shortages to another branch.
Specify the planning horizon, information available when an order is placed, and the costs of surplus and shortage. Capture constraints such as lot sizes, capacity, delivery windows and service obligations.
Review a failure or missing evidence
Exception to inspect
When shelves were empty, zero sales conceal demand. Mark that interval as censored and test the decision under a plausible demand range.
Run an acceptance test
Compare availability, excess stock and order changes on held-out weeks. Report bias separately for slow movers and promoted items. Log overrides with a reason so the next review can distinguish local knowledge from a recurring data defect.
When will the recommendation be infeasible?
Express hard restrictions such as warehouse capacity separately from preferences such as reducing transfers. Ask the planner to challenge a proposed order against real supplier terms. If no feasible action exists, surface the binding constraint and the person who can change it.
Who owns release and recovery?
Decision owner
The planner owns the final order and any override. The planning lead checks service levels, excess stock and overrides across complete ordering cycles.
Acceptance criteria
A planner can inspect a recommendation, vary a binding constraint and explain why an apparently better average forecast could produce a worse order.
Trace the source and destination
Source evidence
Assemble sales by item and location together with stock availability, promotions, supplier lead times, order calendars and returns. Treat a zero-sales day during a stockout differently from an ordinary day with no sales. A forecast used to place an order must reflect what the planner knew at that point.
Reviewed handoff
Replay earlier planning dates using only information available at each cutoff. Compare against the existing rule and show the likely range over the lead time. Translate demand into order packs, apply minimum order quantities and surface exceptions for review at the usual weekly meeting.