Opergens
Oil and gas field operations
Industry practice

Oil & gas

Trace a partner funding decision, a gas-day imbalance or a terminal delay. Each starts with a different operating record and ends with a different commercial owner.

Schedule a call
Upstream

Which share of the cash call belongs to the incoming partner?

A joint venture is preparing its next cash call. One partner held a 30% interest at the start of the month and 25% after a transfer. A single percentage applied to the full forecast can produce a balanced control total while charging the wrong partners.

Finance brings the signed expenditure authority, its effective date and the forecast cost categories into the review. The accountant checks when each cost became eligible, then compares the result with prior funding. Any line that straddles the transfer stays open until the agreement owner confirms its basis.

Trace the cash call
Midstream

Does the apparent shortfall survive the gas-day cutoff?

A shipper nominates 8,000 units. A calendar-day report shows 7,850 received, leaving 150 unexplained. The custody statement uses a different cutoff. Aligning receipts to the contractual gas day brings the total to 7,980 and leaves 20 for investigation.

The reconciliation retains nomination revisions, receipt and delivery points, meter versions and conversion basis. A scheduler can follow the remaining difference to its source without changing the historical nomination. The settlement lead decides whether a correction is needed before issuing a shipper statement.

Inspect the imbalance statement
Downstream

Which hours belong in the demurrage discussion?

The first statement of facts records arrival at 06:10. A later notice says 07:10. Both agree the berth became available at 12:10. Before anyone values the difference, the marine commercial analyst needs to know who issued the correction and whether the counterparty acknowledged it.

A timeline brings together the vessel call, source notices, signed record and relevant clauses. It keeps local times beside normalized times and marks any disputed interval. The contract owner interprets the terms. Finance can release an agreed settlement once the commercial reviewer records the accepted intervals.

Follow the terminal claim
A maintenance planner reviewing a work order beside a trend display.

From a signal to a work order

A change in a pump trend can arrive before the maintenance history does. We ask the planner to reconstruct the last review with the operator, including which reading justified an inspection and what the incoming shift needed to know.

Trace the maintenance handoff

Follow a partner statement through close

When an approved volume changes after close, the production accountant needs the earlier statement and ownership basis. See what each person checks before the revision reaches a partner.

Accounting question

Which production figure belongs in the partner statement?

Production reporting, commercial entitlements and finance can each hold a valid number for a different purpose. Start with a single asset, month and partner whose allocation changed after the close draft.

The finance sponsor identifies the cut-off and the purpose of the statement. The source-of-record discussion covers partner allocation, ownership effective date and unit of measure.

Establish lineage

Keep the revision that supported the original close.

Trace the statement line through approved allocation extracts and dated ownership schedules. Record when each source became available and identify whether the accounting period was already closed.

An asset rename or an entitlement amendment can make a correct quantity land on the wrong partner. Align asset and counterparty identifiers before calculating the difference.

Select the route

Separate ERP posting from source reconciliation.

Check whether an approved ERP report can calculate the required share. Compare that report with a reporting-warehouse view when data crosses systems. Add a custom interface where accountants need a documented exception decision.

An approach that calculates the right number can still fail confidentiality or close controls. Test partner-specific permissions and replay the same revision twice to verify that a duplicate adjustment cannot land.

Reconcile a period

Explain the difference before drafting an adjustment.

A revised allocation changes by 240 barrels. At an unchanged 25% interest the partner quantity changes by 60 barrels. The accountant verifies that the ownership schedule and both statements cover the same period.

Repeat with an interest transfer partway through the period and an amended quantity in another unit. An unexplained residual stays open until a named owner resolves the applicable basis.

Rehearse the close

Train analysts and approvers on different records.

The analyst reconciles the calculation and the controller reviews its source. A locked period or disputed statement follows the existing referral route to the responsible partner.

Include the steps for reopening a review, preserving the previous signed record and withholding an adjustment. The client’s finance authority retains its posting and partner communication permissions.

Hand over operations

Make the next monthly close repeatable.

Run the first live close beside the approved process with read-only source access. Compare unexplained partner variances, rework after sign-off and time spent locating the controlling submission.

Handover includes a versioned mapping, close calendar, exception routes, access matrix and reconciliation procedure. Agree who maintains the integration if the source format or accounting calendar changes.

Inspect the allocation review

Operations workspaceCase review

North block / allocation review

Open
Record detailsCurrent file
Production monthOctober
Allocation basisRevised statement
Working interestAwaiting verification
Source registerReview inputs
  1. Field allocation statements
  2. Tank movement records
  3. Contract ownership schedules
Next decisionHuman review

The production accountant verifies the file and authorizes the next administrative step.

Test a unit conversion, a partner interest that changes mid-month and an amended meter statement. Track unresolved volume differences at the well, facility and partner level.

Production monthOctober
Discovery brief

Which approved operator statement and ownership basis support the number the partner actually sees?

Where work gets stuck
Accounting snapshots do not always reflect a late allocation revision or a midmonth change in interest.
Implementation choice
Keep posting in the ERP. Compare a dated reporting view with a custom exception pack when ownership, units and close rules cross systems.
What your team receives
A field-to-partner reconciliation with original and revised volume, interest basis, adjustment reference and sign-off.

Systems and integration

A typical scope spans field reporting, production accounting and joint-venture settlements. Start with a restricted reporting view or an approved export. Keep the source record identifier, version and observation time in the review interface. Agree how late changes are surfaced and which source is authoritative when identifiers disagree.

One possible platform setup

SAP for financial periods and Databricks for approved allocation extracts.

Published industry cases

Shell · Published by C3 AI

Turn equipment signals into a maintenance review

C3 AI describes Shell running predictive maintenance across equipment in its upstream, manufacturing and integrated gas businesses. The system monitors equipment behaviour for signs that merit attention.

Before rollout

A contractor invoice bills the same service on two field tickets.

Contractor settlement · Field tickets Ticket Claimed shifts FT-81 1 shift FT-81R · replacement 1 shift Invoice total 2 shifts Reviewer’s decision Reconcile the replacement to the original before approving either charge.
What the team notices
One ticket was reissued after a supervisor corrected the site code.
The first check
Compare the signed tickets, replacement reference and purchase order line.
How the team recovers
The contract administrator holds the overlapping charge for supplier reconciliation.
Ready to release when
The approved invoice traces each payable shift to one valid signed ticket.
Oil & gas

Discuss the next production accounting close

Choose a monthly statement where ownership dates, unit conversions or operator revisions keep the close open.

Schedule a call
Search the practice

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?