The decision behind the technology
Can a planner recognize a developing problem early enough to arrange inspection? A usable alert names the asset, the relevant signal interval and the past work that could explain the change.
What your team could test first
Choose one equipment family with reliable maintenance history. Replay alerts against completed inspections, accounting for outages, asset replacements and changed sensor tags.
What to measure
Track actionable alerts, warning lead time and engineer review time. Give the maintenance owner control over work orders.
What to check in your own operation
Pick a past maintenance callout and reconstruct what the equipment historian showed before the work order opened. Ask the planner when a spare and a maintenance window could actually have been secured. An earlier signal has operational value only if it arrives within that planning window and survives comparison with ordinary changes in load.

- The decision behind the technology
- Can a planner recognize a developing problem early enough to arrange inspection? A usable alert names the asset, the relevant signal interval and the past work that could explain the change.
- What your team could test first
- Choose one equipment family with reliable maintenance history. Replay alerts against completed inspections, accounting for outages, asset replacements and changed sensor tags.
- What to measure
- Track actionable alerts, warning lead time and engineer review time. Give the maintenance owner control over work orders.