Opergens
Industrial operations

Upstream oil & gas

A well changes completion identifiers between the daily and monthly records.

Schedule a call
Operations workspaceCase review

Well reporting / monthly close

Open
Record detailsCurrent file
Well identifierWL-207
Report revisionR04
Completion allocationPending match
Source registerReview inputs
  1. Approved well reports
  2. Allocation extracts
  3. Asset master revisions
Next decisionHuman review

The production reporting engineer verifies the file and authorizes the next administrative step.

Replay a well rename, a missing daily return and a completion reported against two facilities. Check that the pack carries forward previously approved revisions.

Well identifierWL-207

Well alias

A renamed well disappears from the monthly report

What Opergens would build

Resolve well and completion identifiers against the dated asset master. Give the reporting engineer both historic and current references for review.

Monthly asset rollupReporting engineer

Which monthly line carries the historic well?

  • May statement uses Well W-18
  • June register renames completion W-18B from 1 June
Reporting engineer

Retain the May identifier and verify the completion mapping before including the renamed line in June.

Spend authority

An expenditure authorization has expired

What Opergens would build

Match proposed partner charges with the approved spending authority, cost category and effective period. A venture accountant checks exceptions before issuing a call.

Partner charge reviewVenture accountant

Is there authority for the September charge?

  • Authorization A42 expires 31 August
  • Charge C78 covers work on 2 September
Venture accountant

Request the signed extension or a new authorization. Hold C78 out of the partner call.

Close revision

Operator corrections arrive after a close

What Opergens would build

Compare revised statements with the approved close snapshot. The accountant sees the affected months and counterparties before drafting an adjustment.

Operator statement bridgeProduction accountant

Which partner statements need a correction?

  • Closed July allocation shows 10,000 bbl
  • August amendment revises July to 10,240 bbl
Production accountant

Compare the July interests against the 240 bbl change and hold any posting until the adjustment is approved.

Planning the implementation

Discovery brief

Did this month’s allocation follow the well, completion or reporting facility that owns the measurement?

Where work gets stuck
Asset names change while historical partner statements retain old completion identifiers.
Implementation choice
Maintain a dated well-to-completion crosswalk. Add extraction for approved field statements arriving outside the production accounting system.
What your team receives
A well reporting pack with source return, effective mapping, ownership schedule and proposed adjustment.
Workflow design

Assemble a well reporting pack

Prepare a report that preserves both identifiers, source times and the approved mapping before monthly reporting.

The working record

The working records include approved well reports, allocation extracts and asset master revisions. The production reporting engineer verifies the file and authorizes the next administrative step. A useful first artifact is a reviewed example with the source beside each finding. It gives the business owner a concrete way to mark information that is missing, out of date or assigned to the wrong record.

What is authoritative at shift change?

Trace an asset, batch or service location through the operational systems with a planner. Record where the identifier changes and how corrections reach the incoming shift. Compare the native reporting view with a connected review pack. A pilot earns its place when staff can resolve exceptions more reliably under the time constraints of a real handover.

Systems and integration

A typical scope spans well reporting, asset registry and production accounting. Start with a restricted reporting view or an approved export. Keep the source record identifier, version and observation time in the review interface. Agree how late changes are surfaced and which source is authoritative when identifiers disagree.

One possible platform setup

Databricks for authorized field records and Power BI for signed-off monthly summaries.

What to test in a pilot

Replay a well rename, a missing daily return and a completion reported against two facilities. Check that the pack carries forward previously approved revisions. The primary measure is reviewed files with the correct record, source version and documented handling of unresolved items. Evaluate the current process and the pilot against the same files, and record the cases on which experienced reviewers disagree.

Production and handover

Keep the accepted record and the reviewer’s explanation in the operating register. The production reporting engineer owns reopened items. If a source is amended after review, preserve the earlier version, flag the affected file and show the difference before it returns to the queue.

Other workflows we can develop

Daily report reconciliation

Compare daily returns with month-end allocation data and send unexplained differences to the reporting engineer.

Joint-venture reporting

Index partner entitlements and approved monthly records into an evidence pack for the asset accountant.

Published industry cases

Shell · Published by C3 AI

Turn equipment signals into a maintenance review

C3 AI describes Shell running predictive maintenance across equipment in its upstream, manufacturing and integrated gas businesses. The system monitors equipment behaviour for signs that merit attention.

Implementation playbooks

Before rollout

A partner expenditure summary attributes a charge to the wrong interest period.

Joint interest · Ownership window 30 June · Work done 40% 01 July · New schedule 35% 10 July · Invoice 35% proposed Reviewer’s decision Check the applicable ownership basis against the approved cost statement.
What the team notices
The ownership schedule changed between work completion and billing.
The first check
Check the dated partner allocation and authorized cost statement.
How the team recovers
Joint-interest accounting isolates the charge and obtains the approved split.
Ready to release when
The restated schedule reconciles to the underlying ledger and effective ownership dates.
Upstream oil & gas

Review field reporting and partner allocations

Choose one field report or partner call where well identifiers, authorizations or dated interests determine the allocation.

Schedule a call
Search the practice

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?