Gas-day cutoff
Gas-day boundaries create apparent imbalances
What Opergens would build
Align nominations and receipts to the contract’s time basis while retaining original timestamps. A settlement analyst can verify real differences.
How much remains after aligning the cutoff?
- Nomination N8 records 8,000 units for gas day 12
- Calendar-day receipt totals 7,850 units on the 12th
Rebuild the receipt on the contract gas day and keep any residual open for measurement review.
Conversion basis
A quantity uses an unconfirmed conversion basis
What Opergens would build
Compare declared units, contract terms and authorized conversion inputs. The analyst sees where the draft depends on a missing basis.
Which approved factor applies to R61?
- Receipt R61 records 450 volume units
- Draft statement uses energy factor F3, unsigned
Request the dated conversion basis and hold the converted charge until it is confirmed.
Shipper match
A revised nomination is attached to the wrong shipper
What Opergens would build
Match contractual location and shipper identifiers to the signed revision. The scheduling coordinator checks ambiguous names before a settlement report changes.
Which shipper authorized the revision?
- Signed revision N17 names shipper S-04
- Draft links it to S-40 at the same location
Verify the signed shipper reference and correct the draft link. Hold both statement updates until confirmed.
Planning the implementation
Does the shipper imbalance persist after both sites use the same contract gas day and unit basis?
- Where work gets stuck
- Late revisions, time-zone cutoffs and different units can create apparent variances at a boundary point.
- Implementation choice
- Use deterministic unit and time alignment before comparing commercial quantities. Route uncertain contract interpretation to settlement staff.
- What your team receives
- A shipper statement bridge with nominations, custody revisions, approved conversions and outstanding differences.
Reconcile commercial nominations and custody statements
Connect the agreed delivery window, actual custody record and applicable settlement period.
The working record
The working records include shipper nominations, approved custody statements and settlement schedules. The scheduling coordinator verifies the file and authorizes the next administrative step. A useful first artifact is a reviewed example with the source beside each finding. It gives the business owner a concrete way to mark information that is missing, out of date or assigned to the wrong record.
What is authoritative at shift change?
Trace an asset, batch or service location through the operational systems with a planner. Record where the identifier changes and how corrections reach the incoming shift. Compare the native reporting view with a connected review pack. A pilot earns its place when staff can resolve exceptions more reliably under the time constraints of a real handover.
Systems and integration
A typical scope spans nomination management, terminal accounting and commercial ERP. Start with a restricted reporting view or an approved export. Keep the source record identifier, version and observation time in the review interface. Agree how late changes are surfaced and which source is authoritative when identifiers disagree.
One possible platform setup
SAP for settlements and Snowflake for approved nomination history.
What to test in a pilot
Test split deliveries, daylight-saving time changes and revised custody statements. Confirm differences remain assigned to the correct commercial counterparty. The primary measure is reviewed files with the correct record, source version and documented handling of unresolved items. Evaluate the current process and the pilot against the same files, and record the cases on which experienced reviewers disagree.
Production and handover
Keep the accepted record and the reviewer’s explanation in the operating register. The scheduling coordinator owns reopened items. If a source is amended after review, preserve the earlier version, flag the affected file and show the difference before it returns to the queue.
Other workflows we can develop
Demurrage evidence
Organize contractual windows and approved timestamps into a review pack for a commercial analyst.
Counterparty correspondence
Create a dated record of agreed changes that a scheduling coordinator can confirm before settlement.
Published industry cases
Link inspection records to the correct pipeline segment
TC Energy describes in-line inspections as part of its pipeline integrity programme. The report establishes the inspection workflow and the types of evidence collected. The AI-assisted record matching below is an Opergens application proposal.