Opergens
Published industry case · BAM Ireland

Find issues hidden across construction records

Autodesk reports that BAM Ireland organized its digital project records and then used Construction IQ to surface potential quality and safety concerns. Consistent records were part of making the analysis useful.

Published operating account

BAM Ireland

Read the account from Autodesk
Opergens’ implementation analysis

The decision behind the technology

A long list of observations does little for a site meeting. The question is which open issue belongs to this location, trade and drawing revision, and who can verify it.

A first implementation

Use one work package. Link observations to the correct location and current drawing. Compare the suggested priorities with the site lead’s list and retain the original photographs.

What to measure

Record stale findings, missed priority issues and time spent assembling the coordination meeting.

What to investigate locally

Trace a recent site issue through the drawing, inspection record and request for information. Check which revision the site team was authorized to build against on that date. If revisions cannot be reconstructed, fix the document register first. A review assistant should surface disagreements with a revision and location a project engineer can verify.

Find issues hidden across construction records — The decision behind the technology: A long list of observations does little for a site meeting. The question is which open issue belongs to this location, trade and drawing revision, and who can verify it.; A first implementation: Use one work package. Link observations to the correct location and current drawing. Compare the suggested priorities with the site lead’s list and retain the original photographs.; What to measure: Record stale findings, missed priority issues and time spent assembling the coordination meeting.
Find issues hidden across construction records
The decision behind the technology
A long list of observations does little for a site meeting. The question is which open issue belongs to this location, trade and drawing revision, and who can verify it.
A first implementation
Use one work package. Link observations to the correct location and current drawing. Compare the suggested priorities with the site lead’s list and retain the original photographs.
What to measure
Record stale findings, missed priority issues and time spent assembling the coordination meeting.

Bring us a workflow you want to improve

Book an online call
Search the practice

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?