The decision behind the technology
A long list of observations does little for a site meeting. The question is which open issue belongs to this location, trade and drawing revision, and who can verify it.
A first implementation
Use one work package. Link observations to the correct location and current drawing. Compare the suggested priorities with the site lead’s list and retain the original photographs.
What to measure
Record stale findings, missed priority issues and time spent assembling the coordination meeting.
What to investigate locally
Trace a recent site issue through the drawing, inspection record and request for information. Check which revision the site team was authorized to build against on that date. If revisions cannot be reconstructed, fix the document register first. A review assistant should surface disagreements with a revision and location a project engineer can verify.

- The decision behind the technology
- A long list of observations does little for a site meeting. The question is which open issue belongs to this location, trade and drawing revision, and who can verify it.
- A first implementation
- Use one work package. Link observations to the correct location and current drawing. Compare the suggested priorities with the site lead’s list and retain the original photographs.
- What to measure
- Record stale findings, missed priority issues and time spent assembling the coordination meeting.