The decision behind the technology
A convincing digital sequence still needs validation against the installed fixture, component tolerances and sensing arrangement. Keep the physical trial linked to the workcell revision.
What your team could test first
Select a bounded assembly task, record fixture and tooling revisions, and compare simulated outcomes with observations from qualified commissioning staff.
What to measure
Measure repeatability across accepted part variants and identify discrepancies that need engineering review before sign-off.
What to check in your own operation
Ask the commissioning team for a recent discrepancy between the assembly model and the physical cell. Check whether its cause was a tool revision, tolerance or changeover assumption, and who owns that input. The first trial should reproduce a known discrepancy and show that the proposed correction still passes the site’s established commissioning checks.

- The decision behind the technology
- A convincing digital sequence still needs validation against the installed fixture, component tolerances and sensing arrangement. Keep the physical trial linked to the workcell revision.
- What your team could test first
- Select a bounded assembly task, record fixture and tooling revisions, and compare simulated outcomes with observations from qualified commissioning staff.
- What to measure
- Measure repeatability across accepted part variants and identify discrepancies that need engineering review before sign-off.