Opergens
Published industry case · Office for Metropolitan Architecture

Compare design options within a stadium brief

Autodesk documents how OMA used BIM, automation and generative design while exploring the proposed Feyenoord stadium design. The account describes the design process and the model foundation it required.

Design study

Office for Metropolitan Architecture

Read the account from Autodesk
Opergens’ implementation analysis

The decision behind the technology

An option is only comparable if it follows the same brief. A change to the model revision or an evaluation condition can change the ranking before an architect sees it.

A first implementation

Use a bounded design area and agreed performance criteria. Retain the model revision, fixed constraints and reasons the architect accepted or rejected each option.

What to measure

Count viable options, rejected constraint violations and the time to prepare a design review with reproducible assumptions.

What to investigate locally

Choose a design requirement the project architect can quantify and one that demands professional judgment. Compare options at the same drawing revision and level of detail. If the measurable winner compromises circulation or conflicts with the brief, record why the architect rejected it. That decision trail matters when another discipline revisits the option later.

Compare design options within a stadium brief — The decision behind the technology: An option is only comparable if it follows the same brief. A change to the model revision or an evaluation condition can change the ranking before an architect sees it.; A first implementation: Use a bounded design area and agreed performance criteria. Retain the model revision, fixed constraints and reasons the architect accepted or rejected each option.; What to measure: Count viable options, rejected constraint violations and the time to prepare a design review with reproducible assumptions.
Compare design options within a stadium brief
The decision behind the technology
An option is only comparable if it follows the same brief. A change to the model revision or an evaluation condition can change the ranking before an architect sees it.
A first implementation
Use a bounded design area and agreed performance criteria. Retain the model revision, fixed constraints and reasons the architect accepted or rejected each option.
What to measure
Count viable options, rejected constraint violations and the time to prepare a design review with reproducible assumptions.

Bring us a workflow you want to improve

Book an online call
Search the practice

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?