Opergens
Published industry case · City of South Bend

Use network conditions to manage wet-weather capacity

Xylem’s account of South Bend’s combined sewer network describes using network monitoring and real-time control to make better use of existing capacity during wet weather.

Published operating account

City of South Bend

Read the account from Xylem
Opergens’ implementation analysis

The decision behind the technology

This is an operational analytics reference. For a new advisory system, start by showing an operator where capacity information is missing or out of date.

A first implementation

Replay recorded storm periods against the existing operating log. Mark sensor gaps and distinguish instrument failure from an actual change in network conditions.

What to measure

Review agreement with validated readings, missing-data alerts and operator interpretation before discussing changes to control authority.

What to investigate locally

Review a past rain event with the duty operator and identify which level readings arrived late or disappeared. Compare the suggested action with the operating limits and available capacity at the receiving location. Where telemetry coverage is incomplete, a shared status view and a clear escalation threshold can be a better first investment than a new recommendation engine.

Use network conditions to manage wet-weather capacity — The decision behind the technology: This is an operational analytics reference. For a new advisory system, start by showing an operator where capacity information is missing or out of date.; A first implementation: Replay recorded storm periods against the existing operating log. Mark sensor gaps and distinguish instrument failure from an actual change in network conditions.; What to measure: Review agreement with validated readings, missing-data alerts and operator interpretation before discussing changes to control authority.
Use network conditions to manage wet-weather capacity
The decision behind the technology
This is an operational analytics reference. For a new advisory system, start by showing an operator where capacity information is missing or out of date.
A first implementation
Replay recorded storm periods against the existing operating log. Mark sensor gaps and distinguish instrument failure from an actual change in network conditions.
What to measure
Review agreement with validated readings, missing-data alerts and operator interpretation before discussing changes to control authority.

Bring us a workflow you want to improve

Book an online call
Search the practice

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?