Kit substitution
Maintenance kits arrive under substituted part numbers
What Opergens would build
Compare reserved kits with the approved equipment specification and substitution record. Stores staff verify outstanding components before planning releases the job.
Is the reserved kit ready for issue?
- Reserved kit K14 needs seal S8 and coupling C3
- Picking note PN9 supplies S8A with no substitution approval attached
Hold the disputed seal and request its approved equivalence record before releasing K14.
Crew overlap
A shutdown schedule hides crew dependencies
What Opergens would build
Match work packages to approved prerequisites, trades and service windows. Planners review conflicting assignments and missing sign-offs in the existing schedule.
Can both jobs start as planned?
- Schedule J18 books rigging crew R2 from 08:00 to 12:00
- Job J23 also books R2 from 10:00 to 13:00
Flag the two-hour overlap and leave J23 provisional until a qualified crew or revised slot is confirmed.
Old notes
Historic equipment notes are hard to interpret
What Opergens would build
Retrieve inspection narratives for the current asset and component revision. A reliability engineer reviews linked observations before changing maintenance priorities.
Which asset owns the historic note?
- Log L14 refers to “west screen” on 2 February
- Register shows screen SC1 was replaced by SC2 on 10 February
Attach the February 2 note to SC1 and leave any relevance to SC2 for engineering review.
Planning the implementation
Which jobs could actually proceed if the next shutdown window started tomorrow?
- Where work gets stuck
- A work order can appear planned while its kit, access reference or contractor prerequisite remains outstanding.
- Implementation choice
- Use the planning system’s reservation checks first. Connect the warehouse and contract records where readiness is only visible off-system.
- What your team receives
- A shutdown readiness pack with blocked dependencies, alternative windows and the approving planner.
Prepare a maintenance backlog review
For a conveyor service window, assemble open jobs with current parts reservations and crew prerequisites. Highlight a job whose replacement kit is still in transit and another affected by an outdated asset tag.
Shutdown work pack
Open- Equipment service logs
- Spare-parts records
- Shift reports
A planner checks dependencies before releasing a work order.
Use a historic shutdown where the schedule changed. Check whether each proposed job had the required part, isolation approval reference and approved maintenance scope at the time of planning.
The working record
The working records include equipment service logs, spare-parts records and shift reports. A planner checks dependencies before releasing a work order. A useful first artifact is a reviewed example with the source beside each finding. It gives the business owner a concrete way to mark information that is missing, out of date or assigned to the wrong record.
What is authoritative at shift change?
Trace an asset, batch or service location through the operational systems with a planner. Record where the identifier changes and how corrections reach the incoming shift. Compare the native reporting view with a connected review pack. A pilot earns its place when staff can resolve exceptions more reliably under the time constraints of a real handover.
Systems and integration
A typical scope spans maintenance planning, equipment hierarchy and spare-parts inventory. Where the business record lives in SAP, agree the company, plant or organizational unit and the document key before extracting any fields. Begin with an authorized read path. Route a proposed correction through the existing business transaction and keep the approval reference beside it.
One possible platform setup
A Databricks inspection history can complement equipment records in SAP. Retain site identifiers and approved service-window references when assembling a maintenance pack.
What to test in a pilot
Use a historic shutdown where the schedule changed. Check whether each proposed job had the required part, isolation approval reference and approved maintenance scope at the time of planning. The primary measure is work orders with complete parts information. Evaluate the current process and the pilot against the same files, and record the cases on which experienced reviewers disagree.
Production and handover
Keep work release with the planner and site operating authority. Carry source timestamps into the planning pack and provide a refresh procedure for reservations that change before the shutdown.
Other workflows we can develop
Inspection issue summaries
Group inspection observations by equipment tag, date and operating condition. The reliability engineer checks recurring findings against the underlying reports.
Stock reservation reconciliation
Compare parts reservations with warehouse availability and incoming deliveries. A stores coordinator verifies substitutes and unresolved shortages before a planner releases a job.
Published industry cases
Bring an equipment signal to the maintenance team
Rio Tinto describes operations centres using analytics and monitoring to identify maintenance issues, including high friction on equipment. The signal gives maintenance staff a reason to inspect an asset.