A maintenance backlog combines urgent work, parts availability and equipment that is accessible only during a scheduled stop. The planner needs to see the dependency that makes an otherwise ready job impossible.

Request a call

Kit substitution

Maintenance kits arrive under substituted part numbers

What Opergens would build

Compare reserved kits with the approved equipment specification and substitution record. Stores staff verify outstanding components before planning releases the job.

Stores kit verificationStores supervisor

Is the reserved kit ready for issue?

  • Reserved kit K14 needs seal S8 and coupling C3
  • Picking note PN9 supplies S8A with no substitution approval attached
Stores supervisor

Hold the disputed seal and request its approved equivalence record before releasing K14.

Crew overlap

A shutdown schedule hides crew dependencies

What Opergens would build

Match work packages to approved prerequisites, trades and service windows. Planners review conflicting assignments and missing sign-offs in the existing schedule.

Shutdown resource boardShutdown scheduler

Can both jobs start as planned?

  • Schedule J18 books rigging crew R2 from 08:00 to 12:00
  • Job J23 also books R2 from 10:00 to 13:00
Shutdown scheduler

Flag the two-hour overlap and leave J23 provisional until a qualified crew or revised slot is confirmed.

Old notes

Historic equipment notes are hard to interpret

What Opergens would build

Retrieve inspection narratives for the current asset and component revision. A reliability engineer reviews linked observations before changing maintenance priorities.

Equipment history reviewMaintenance planner

Which asset owns the historic note?

  • Log L14 refers to “west screen” on 2 February
  • Register shows screen SC1 was replaced by SC2 on 10 February
Maintenance planner

Attach the February 2 note to SC1 and leave any relevance to SC2 for engineering review.

Planning the implementation

Discovery brief

Which jobs could actually proceed if the next shutdown window started tomorrow?

Where work gets stuck
A work order can appear planned while its kit, access reference or contractor prerequisite remains outstanding.
Implementation choice
Use the planning system’s reservation checks first. Connect the warehouse and contract records where readiness is only visible off-system.
What your team receives
A shutdown readiness pack with blocked dependencies, alternative windows and the approving planner.
Workflow design

Prepare a maintenance backlog review

For a conveyor service window, assemble open jobs with current parts reservations and crew prerequisites. Highlight a job whose replacement kit is still in transit and another affected by an outdated asset tag.

Operations workspaceCase review

Shutdown work pack

Open
Record detailsCurrent file
AssetConveyor 07
ShutdownWindow B
Spare kitIn transit
Source registerReview inputs
  1. Equipment service logs
  2. Spare-parts records
  3. Shift reports
Next decisionHuman review

A planner checks dependencies before releasing a work order.

Use a historic shutdown where the schedule changed. Check whether each proposed job had the required part, isolation approval reference and approved maintenance scope at the time of planning.

AssetConveyor 07

The working record

The working records include equipment service logs, spare-parts records and shift reports. A planner checks dependencies before releasing a work order. A useful first artifact is a reviewed example with the source beside each finding. It gives the business owner a concrete way to mark information that is missing, out of date or assigned to the wrong record.

What is authoritative at shift change?

Trace an asset, batch or service location through the operational systems with a planner. Record where the identifier changes and how corrections reach the incoming shift. Compare the native reporting view with a connected review pack. A pilot earns its place when staff can resolve exceptions more reliably under the time constraints of a real handover.

Systems and integration

A typical scope spans maintenance planning, equipment hierarchy and spare-parts inventory. Where the business record lives in SAP, agree the company, plant or organizational unit and the document key before extracting any fields. Begin with an authorized read path. Route a proposed correction through the existing business transaction and keep the approval reference beside it.

One possible platform setup

A Databricks inspection history can complement equipment records in SAP. Retain site identifiers and approved service-window references when assembling a maintenance pack.

What to test in a pilot

Use a historic shutdown where the schedule changed. Check whether each proposed job had the required part, isolation approval reference and approved maintenance scope at the time of planning. The primary measure is work orders with complete parts information. Evaluate the current process and the pilot against the same files, and record the cases on which experienced reviewers disagree.

Production and handover

Keep work release with the planner and site operating authority. Carry source timestamps into the planning pack and provide a refresh procedure for reservations that change before the shutdown.

Other workflows we can develop

Inspection issue summaries

Group inspection observations by equipment tag, date and operating condition. The reliability engineer checks recurring findings against the underlying reports.

Stock reservation reconciliation

Compare parts reservations with warehouse availability and incoming deliveries. A stores coordinator verifies substitutes and unresolved shortages before a planner releases a job.

Published industry cases

Rio Tinto · Published by Rio Tinto

Bring an equipment signal to the maintenance team

Rio Tinto describes operations centres using analytics and monitoring to identify maintenance issues, including high friction on equipment. The signal gives maintenance staff a reason to inspect an asset.

Before rollout

A spare-parts shortlist includes an incompatible component.

Fleet spare · Pump kit Installed serial MX-530 Proposed kit K1 MX-100–499 Approved kit K2 MX-500–699 Reviewer’s decision Route kit K2 to the parts specialist for confirmation.
What the team notices
The fleet lists one machine family with two installed configurations.
The first check
Compare the equipment serial range with approved parts substitutions.
How the team recovers
The planner routes the requisition to the parts specialist before purchase.
Ready to release when
The approved request records compatibility with the specific installed configuration.
Mining & materials

Review maintenance readiness for a shutdown

Choose a shutdown work package whose parts or service prerequisites are difficult to verify in time.