Wafer lineage
An assembly split hides wafer-lot lineage
What Opergens would build
Traverse approved lot relationships and surface incomplete joins. A quality engineer verifies the source travelers before providing a lot list.
Which child lot supplied P-82?
- Wafer lot W-31: split into A and B
- Assembly lot P-82: parent recorded only as W-31
Reconcile traveler and quantity records across the split. Keep P-82 lineage open until the child identifier is confirmed.
Test alias
A test record uses the subcontractor’s naming convention
What Opergens would build
Match external package identifiers to the controlled product and lot register. Ambiguous mappings stay with the responsible supplier quality lead.
Do these identifiers refer to the same tested material?
- Subcontractor test log: lot X17-4
- Internal release list: die lot DL-417
Check the approved cross-reference and test revision. Hold attachment of the result until the lot match is verified.
Shipment revision
A shipment references a superseded customer specification
What Opergens would build
Compare the customer revision effective on shipment date with the release pack. A product quality owner confirms which evidence can be shared.
Which specification governs this shipment date?
- Shipment file: specification CS-19 rev C
- Customer acceptance record: rev D effective 1 August
Compare the effective date and any signed deviation with the order. Keep release pending the quality decision.
Planning the implementation
Can quality trace a shipped device through each approved lot split and packaging record?
- Where work gets stuck
- Traceability can disappear when a subcontractor changes package lot references or returns revised test documentation.
- Implementation choice
- Use exact genealogy keys before applying candidate matching to external lot identifiers. Escalate uncertain links to supplier quality.
- What your team receives
- A lot-to-shipment evidence manifest with split quantities, subcontractor references and quality-approved scope.
Check lot genealogy before a customer documentation release
Reconcile released wafer, package and shipment lot references across a split batch, preserving the source traveler. The quality lead determines the scope of the response and authorizes disclosure.
The working record
The working records include approved lot travelers, assembly batch records and released product specifications. The manufacturing quality lead verifies the file and authorizes the next administrative step. A useful first artifact is a reviewed example with the source beside each finding. It gives the business owner a concrete way to mark information that is missing, out of date or assigned to the wrong record.
What is authoritative at shift change?
Trace an asset, batch or service location through the operational systems with a planner. Record where the identifier changes and how corrections reach the incoming shift. Compare the native reporting view with a connected review pack. A pilot earns its place when staff can resolve exceptions more reliably under the time constraints of a real handover.
Systems and integration
A typical scope spans manufacturing execution, product lifecycle management and shipment traceability. Start with a restricted reporting view or an approved export. Keep the source record identifier, version and observation time in the review interface. Agree how late changes are surfaced and which source is authoritative when identifiers disagree.
One possible platform setup
SAP for shipment references and Databricks for authorized genealogy extracts.
What to test in a pilot
Check lot splits and merges, subcontracted test records, reused customer part numbers and late record corrections. Evaluate missing trace links independently from extraneous lots that enlarge the review. Production process settings stay outside this workflow. The primary measure is reviewed files with the correct record, source version and documented handling of unresolved items. Evaluate the current process and the pilot against the same files, and record the cases on which experienced reviewers disagree.
Production and handover
Keep the accepted record and the reviewer’s explanation in the operating register. The manufacturing quality lead owns reopened items. If a source is amended after review, preserve the earlier version, flag the affected file and show the difference before it returns to the queue.
Other workflows we can develop
Customer specification mapping
Compare released customer part numbers and permitted specification revisions for quality review.
Supplier certificate reconciliation
Match approved material certificates with incoming lot identifiers for a receiving engineer.
Industry reference
TI describes different marking and traceability conventions in its quality guidance. The review should establish the exact identifiers a supplier supports before treating a date code as a unique lot reference.
Texas Instruments quality guidelinesPublished industry cases
Connect an inspection finding to a verifiable source record
Micron describes using computer vision on wafer images and an automatic defect-classification system in its own manufacturing operations. The account describes inspection work at Micron.
