Records and access
Read issue keys, status history, pull-request references and the release manifest from the authorized project. Document the mapping between a deployment and its tickets.
Action and approval
The release manager checks included work, records exceptions and signs off on the release notes.
Deployment considerations
A resolved ticket can miss the deployment. Verify the build reference before calling a change released.
Failure and recovery
If a deployment is rolled back while notes await approval, retain the draft against the original build and open a new review for the current revision. Never silently move evidence between releases.
A production acceptance test
Include a reverted change, a cherry-picked fix and a ticket closed after release. Compare the summary with the manifest.
Operator handover
Deliver the release-to-ticket mapping and a reconciliation check for changes without associated tickets. Document who may approve a public summary versus an internal engineering record.