Records and access
Inventory approved compute, available accelerator capacity, network zones, certificate management and internal storage with IT operations.
Action and approval
The internal operator owns scheduled releases, restoration, model packaging and the capacity plan after handover.
Deployment considerations
Model size, throughput and update frequency determine the hardware requirement. Disconnected environments need an approved update route.
Failure and recovery
When hardware capacity is exhausted, queue requests or return a controlled handoff. Recover pending work with its existing identifier after available capacity returns, preserving the customer’s network boundary.
A production acceptance test
Run a realistic concurrency test, isolate a dependency and restore from an internal backup under the client operator’s account.
Operator handover
Provide the approved package manifest, offline update procedure, capacity baseline and recovery instructions. Test restoration without the delivery team’s credentials and identify who renews certificates or updates model packages.