Dimension queried on an old drawing
A site query cites detail D-18 on revision B. Revision C changes a dimension, while the supplier’s shop drawing still references B.
The coordinator flags the conflicting revisions, links the current document and prepares an RFI for the authorized reviewer. It keeps potential schedule or cost effects open.
Project engineer
The authorized designer or engineer owns the technical response. The project team controls issue, distribution and any downstream change authorization.
Use what you have or build?
- Start with the existing tool
- Try the construction platform’s existing RFI routing and document register on an ordinary field query.
- When to connect your systems
- Add a review layer when a query crosses revisions, package permissions or several previously issued clarifications.
- What to compare
- Check the governing drawing and final authorized response on each sampled RFI and count avoidable returns for missing evidence.
Where it fits
Useful when several contractors ask similar questions against different drawing revisions and an informal reply could be mistaken for an instruction.
Source requirements
Current drawing register, specification revisions, requests for information and project distribution permissions.
Configure the first release
Agree the document source of truth, number scheme, official response role and how changes are distributed to entitled project participants.
Exceptions to plan for
Treat a similar past RFI as reference material. The responsible engineer checks applicability to the exact revision and location.
Test the pilot
Use a superseded drawing, duplicate query and restricted subcontract package. Verify that only the official response updates the RFI and no change order is authorized automatically.
Operating handover
Hand over the status map, revision controls, due-date queue and a record of approved responses linked to the source question.