Picking and packing capacity
A warehouse proposes adding a picking shift. Packing capacity stays fixed and inbound deliveries cluster in the afternoon.
The comparison shows the projected queue moving from picking to packing. The supervisor can examine a staggered shift and identify which assumptions need an on-site trial.
Process owner
The process owner accepts the baseline simulation and decides which scenario merits an operational trial.
Use what you have or build?
- Start with the existing tool
- Try a spreadsheet queue calculation before building a detailed simulation of a process.
- When integration earns its place
- A twin earns its complexity when resource contention, shift boundaries and variable service times alter the decision.
- What to compare
- Compare throughput and queue behavior at individual stations on a held-out shift, including the location of the bottleneck.
Where it fits
Useful where a team needs to test a capacity or scheduling decision before disrupting a live process.
Source requirements
A process map, resource capacities, service times, historical arrivals and known scheduling constraints.
Configure the first release
Map the physical process with its supervisors and measure arrivals, buffers, shift calendars and task durations.
Exceptions to plan for
Expose missing observations and untested resource constraints alongside each scenario result.
Test the pilot
Calibrate against several completed weeks including a disrupted week. Compare queue times and throughput by process stage and document where the model diverges.
Operating handover
Give operators the baseline calibration, scenario definitions and a procedure for refreshing capacity inputs.