Road segment register
Verified repeat marking loss
- W-12
- W-18
- W-20
- W-22
W-18 · recurring marking loss
Source record
- Segment W-18
- two dated observations
- jurisdiction confirmed
Decision
Send to maintenance planning
Inspect the reasoning
The inspector verifies the imagery and checks for an existing work order. The planner chooses the intervention and scheduling priority.
Obstructed recent image
- W-12
- W-18
- W-20
- W-22
W-22 · inspector review required
Source record
- Segment W-22
- parked vehicle in frame
- direction uncertain
Decision
Request a new observation
Inspect the reasoning
The evidence cannot establish the current condition or exact segment. Preserve the frame and avoid issuing a duplicate or mislocated work order.
Which observation gives the inspector enough evidence to revisit a street segment?
- Bring to discovery
- Bring the road register, dated survey frames, direction of travel, jurisdiction and prior work orders.
- Evidence to proceed
- Pilot on a bounded route and compare useful referrals with duplicate or unverifiable observations. Qualified staff retain condition ratings and work authorization.
What the engagement delivers
A segment-level review workspace, links to permitted source evidence, duplicate handling and a controlled handoff to the municipality's existing works queue.
Implementation decisions
Periodic inspection survey or continuous observation queue?
Periodic inspection survey
A route survey gives consistent evidence at known intervals and simplifies comparison over time.
continuous observation queue
A continual observation feed adds coverage and raises questions about duplication, image quality and jurisdiction.
A route survey gives consistent evidence at known intervals and simplifies comparison over time. A continual observation feed adds coverage and raises questions about duplication, image quality and jurisdiction.
Where to start in your organization
A small team
Start with one district, a recent survey and a maintained list of open orders. Compare proposed visits with inspector review.
Across an enterprise
Agree a consistent segment model across districts and contractors. Audit coverage, privacy, duplicates and completion evidence across the network.
Select a municipal survey route with a current asset register and recent work history. Define usable imagery, duplicate observations, jurisdiction boundaries and who verifies a candidate defect in the field.
Review a failure or missing evidence
Exception to inspect
A GPS point close to a junction can match the wrong carriageway. Check segment and direction against the asset register.
Run an acceptance test
Review clear, obstructed, mislocated and duplicated observations. Compare segment matches with the asset register, then verify the boundary between jurisdictions. Measure useful referrals and duplicate work orders alongside detection coverage. A new inspection can reopen a previously closed observation.
What must the operator verify?
A GPS point close to a junction can match the wrong carriageway. Check segment and direction against the asset register. The municipal inspector confirms the observation. The works planner owns priority, funding and crew assignment.
Who owns release and recovery?
Decision owner
The municipal inspector confirms the observation. The works planner owns priority, funding and crew assignment.
Acceptance criteria
An inspector can locate the observation, confirm its date and confidence, request another inspection and authorize an appropriate referral using the existing maintenance process.
Trace the source and destination
Source evidence
Use authorized survey images, street segment, direction, capture date, location confidence, inspection history and jurisdiction. Record conditions that can obscure the marking or surface. Remove identifying information from images according to the operator's approved handling process.
Reviewed handoff
Group observations on the same segment and show current and prior evidence. A trained inspector reviews whether a defect is confirmed, an existing order already covers it or another observation is needed. A works planner sets priority and assigns a crew under municipal procedures.