Test a scheduling, capacity or maintenance decision in a calibrated model of the operation.

Capacity scenario viewer

Add packing capacity

Source record

  • Packing: 60 units/hour
  • inspection: 45
  • demand: 55

Decision

Inspection still limits flow

Inspect the reasoning

Adding another packing slot cannot raise sustained output above the 45-unit inspection capacity in this scenario.

Extend inspection window

Source record

  • Packing: 60 units/hour
  • inspection: 55
  • demand: 55

Decision

Trial the inspection change

Inspect the reasoning

The capacities now meet demand under the stated assumptions. Compare queues, shift coverage and changeover variability before authorizing a physical trial.

Commissioning decision

Which bottleneck must the model reproduce before it can guide a change?

Bring to discovery
Bring observed arrivals, queues, shift calendars and at least one real disruption with its operating outcome.
Evidence to proceed
Authorize a supervised trial when the model reproduces station-level behavior within a useful tolerance and the operator knows which assumptions remain unverified.

What the engagement delivers

A calibrated baseline, a scenario comparison with uncertainty, and a record of the operating conditions in which the model is credible.

Implementation decisions

Capacity model or event simulation?

Capacity model

A queue or capacity spreadsheet can answer a stable bottleneck question with relatively few parameters.

event simulation

A discrete-event simulation can handle variable repairs and competing resources, but requires calibration against observed event sequences.

Use the simplest representation that captures the constraint being tested. Detailed geometry adds little to a staffing decision driven by variable queue lengths. An engineer should be able to identify which clock, resource or transition controls each scenario result.

Where to start in your organization

A small team

Represent one shift and one bottleneck. Ask the supervisor to challenge impossible transitions before testing an investment.

Across an enterprise

Replay multiple lines and shifts, calibrate against held-out events and publish operating bounds for reuse after layout or equipment changes.

Define one decision and the resolution it requires. A model for shift planning needs queue and changeover behavior. Maintain a register of assumptions and ask frontline staff where the recorded event stream misses real work.

Review a failure or missing evidence

Exception to inspect

If the model matches total throughput but predicts the wrong queue, test each station separately. Offsetting errors can disguise a poor simulation.

Run an acceptance test

Reserve shifts that were not used for calibration. Check whether the model reproduces the order and duration of disruptions closely enough for the decision. Report uncertainty with every scenario and record which observations would justify recalibration.

When does a simulation need recalibration?

Tie each uncertain input to an observation that can update it. A new shift pattern, changed material or faster packing station can invalidate a previously adequate model. Record when a scenario was tested and restrict reuse to decisions within the documented operating range.

Who owns release and recovery?

Decision owner

The operations lead accepts the decision scope. A qualified supervisor authorizes any physical trial and records the changed conditions.

Acceptance criteria

A held-out shift reproduces the agreed reference measures closely enough for planning. Supervisors understand which proposed changes require a supervised physical trial.

Trace the source and destination

  1. Source evidence

    Start with station times, shift calendars, changeovers, rejection and rework events, buffer limits and planned maintenance. Select one bottleneck and a historical shift to replay. Real operators can identify impossible transitions that look perfectly legal in a planning spreadsheet.

  2. Reviewed handoff

    Calibrate the simulated queue against observed throughput and waiting time. Test one changed assumption at a time and retain the original as a reference. Include a range for repair or changeover duration. Operations signs off on a trial window and keeps the existing control system in charge.

Bring us a workflow you want to improve

Request a call
Search Opergens

Help us diagnose your issue

Which industry are you in?
How large is your organisation?
What slows you down most?
What would a better working day look like?